Saturday, April 9, 2016

More Kitchen Progress

 
 
The tile went up without incident.  I decided to stop it just under the shelf.  It would be a huge problem (and lots of weird cuts) to run it all the way up to the ceiling and through the structural cables.  The top row ended at a very good place for the shelf, where the range hood chimney cover could end without any cutting or special fabrication. 
 
The shelf was something else.  I knew it would be tough because it needed to fit exactly between the two vertical slabs that are not very square to the wall. I also needed to provide support through the length. I did not want the supports to show, so I set steel pins into the studs and had to drill corresponding holes in the edge of the shelf.  Good luck with that, right?
 

I measured very carefully and did my best to drill level.  I still needed to drill the shelf holes oversize to get the pins to go in.  I do not have photos of me pounding on the shelf with a sledge hammer to get it to the wall.  But it did get there.





This part of the kitchen is basically done.  Now on to the island.

No comments:

Post a Comment